Calculators
Samples
  • Christmas Sale! Enjoy 15% off composite decking, cladding, fencing, and more! Use code SANTA15 (Excludes fixings and subframes)
  •  FREE DELIVERY on all orders over £1000*

  • Christmas Sale! Enjoy 15% off composite decking, cladding, fencing, and more! Use code SANTA15 (Excludes fixings and subframes)
  •  FREE DELIVERY on all orders over £1000*

0 £0.00

Installing Last Deck Board Using Metal Clips

Cladding and Fixings with Screws - Assured Composite

Installing Last Deck Board Using Metal Clips

1. Fix the final deck board as normal but do not fix the metal clips to the outer groove.

2. Pre-drill holes and screw through the outer groove at an angle and into the joist. Start at 80mm approx then at every 300mm approx intervals.

3. Where the groove is not accessible pre-drill holes and screw through the face of the deck board avoiding the groove.

Need Some Help? We've Got You Covered!

Explore our frequently asked questions or use our convenient search feature to locate the information you need. Alternatively give our team a call on 01664 400 140 and we'd be happy to help!

© Assured Composite 2024. All Rights Reserved. Assured Composite is a registered company in England and Wales under Company Number: 10166812. VAT Number: 244830019.
Top