Vertical Composite Cladding Layout

Garden Room With Cedar Composite Cladding - Assured Composite

Vertical Cladding Layout

Carefully plan the area checking all measurements. Measure and cut battens where required.

1. Fix battens into position leaving 300mm max intervals between each batten centre to centre.

2. Fix battens into place with expansion screws by drilling holes through the middle groove of each batten and into the wall. Start at 80mm approx then at 500mm approx intervals.

3. Double batten where cladding boards meet at butt joins allowing a 3mm gap between battens.

Need Some Help? We've Got You Covered!

Explore our frequently asked questions or use our convenient search feature to locate the information you need. Alternatively give our team a call on 01664 400 140 and we'd be happy to help!

© Assured Composite 2024. All Rights Reserved. Assured Composite is a registered company in England and Wales under Company Number: 10166812. VAT Number: 244830019.
Top